22August2024
Visite découverte du parc éolien d'Assac
Thursday, August 22 at 10:30 a.m.
Town hall of Assac 81340 Assac
Discovery of the operation of the wind farm on the heights of Assac or how kinetic energy is transformed into electrical energy.
In partnership with the CGN Europe Energy group and the Assac Town Hall.
Reservations required – July 25 and August 22
In partnership with the CGN Europe Energy group and the Assac Town Hall.
Reservations required – July 25 and August 22
Vincent, an employee of CGN Europe Energy, takes you to discover how the wind farm works on the heights of Assac. How is kinetic energy transformed into electrical energy? How is the electricity produced used? He will answer all your questions!
In partnership with the CGN Europe Energy group and the Assac Town Hall.
Limited to 50 people.
15-20 min walk to reach the site.
By reservation required.
Meet in front of Assac town hall.
Accessible for PMR – Bring a hat as the area is not shaded. Access to the inside of the wind turbine not included in the visit for safety reasons.
In partnership with the CGN Europe Energy group and the Assac Town Hall.
Limited to 50 people.
15-20 min walk to reach the site.
By reservation required.
Meet in front of Assac town hall.
Accessible for PMR – Bring a hat as the area is not shaded. Access to the inside of the wind turbine not included in the visit for safety reasons.
Themes:
- Professional
All dates and times
Opening hours on August 22, 2024 | |
---|---|
Thursday | Opens at 10:30 p.m. |
Prices
Further information) :
Mandatory reservation
Access map
Get in touch